T-Con Board - Post-Installation Checklist
After replacing the T-Con board, follow this checklist to ensure optimal performance and prevent repeat issues:
-
Firmware Update – Check for the latest TV firmware and install if needed for panel compatibility.
-
Panel ID Verification – In the service menu, confirm the panel ID matches the new board (only if applicable).
-
Cable Connections – Ensure LVDS/ribbon cables are fully seated, locked, and clean.
-
Voltage Test – Measure VGH, VGL, and VCOM voltages to confirm panel power stability.
-
Factory Reset – Perform a reset to clear old error codes and recalibrate display settings.
-
Visual Test – Play high-resolution video content to confirm clarity, colors, and no flickering.